ONE EXAMPLE (ANALYSIS OF RATE)


          ANALYSIS OF RATE

ANALYSIS THE RATE OF FOLLOWING ITEMS OF WORKS


BRICK WORK IN CEMENT MORTER ( 1 : 6)  :----YOU MAY ASSUME CEMENT – Rs 8100/MT , BRICK Rs 8500/%0NUMBERS ,SAND(coarse)-Rs 1150/M3 , SAND ((med) Rs 950/M3 ,HEAD MASON -326/DAY,ORDINARY MASIN -296/DAY , MAZDOOR-245/DAY.

Consider 10 cum volume of brickwork.
Size of one brick with mortar = ( 200 * 100 * 100 ) mm3
No of bricks = 10/(0.2*0.1*0.1) = 5000 nos.
Size of one brick without mortar =(190*90*90 ) mm3
Volume of mortar =10 – (5000*0.19*0.09*.009) =2.305m3
Due to filling and wastage , the quantity is to be increased by 15%
Volume of the wet mortar =(2.305*1.15) = 2.64m3
When dry , this quantity to be increased by 33%
Hence , volume of dry mortar =(2.64*133) =3.51 m3
Volume of cement =3.51/7 =.50 Cum = 0.72 T
Volume of sand = 3.51*6/7 =3.0 Cum
Considering  70 % coarse sand & 30% medium sand
Coarse sand =2.1 Cum
Med. Sand = 0.9 cum
Particular
Quantity
Rate(Rs )
Amount(Rs)

                                                                MATERIALS

bricks
5000 nos
8500 per 1000
42500
Sand(coarse)
2.1 Cum
1150/Cum
2414
Sand(med.)
0.9 Cum
950/Cum
855
Cement
0.72 MT
8100/MT
1500
Scaffolding
L.S
1500
                                                                             Total =53102

                                                                                      LABOUR

Head Mason
½ nos
326Rs/day
163
Mason
8 nos
296 Rs/day
2368
Mazdoor
17 nos
245/day
4165
Including visti          
                                                                                          Total


6696
  Contingencies L.S @ ½ %                                      =   299
                                                                                 Total   =60097
Water charges @ 1% of total                                   =   600.97
                                                                        Total   =60097.97
Profit & overhead @ 10 % of total                          = 6069.80
                                                             GRAND TOTAL =66767.77

RATE PER CUM =66767.77 /10 =6676.78   (ANS)
ONE EXAMPLE (ANALYSIS OF RATE)

Our Youtube Channel:-Specialised Civil

Post a Comment

4 Comments

Emoji
(y)
:)
:(
hihi
:-)
:D
=D
:-d
;(
;-(
@-)
:P
:o
:>)
(o)
:p
(p)
:-s
(m)
8-)
:-t
:-b
b-(
:-#
=p~
x-)
(k)